The Packaging
Standard blister pack, where some pressure can pop out the back panel, allowing reuse of the pack if required.
The models
The models are nicely detailed however one crew member appear's to be wearing a longcoat which doesn't really fit with my summer uniform force. This, of course, is a minor issue.
The building of the models
These models had a lots of flash and mold lines, which took several minutes to remove. The mortar was carefully clipped free of it's metal tag then glue was added to the rest part of the stand and the legs, these were then positioned on the base. Glue was applied to the base of the mortar then the mortar was carefully aligned with the stand. Once the mortar was in position the crew was positioned around.
Once the models were tidied up, it took no time to set up the base, I'm looking forward to painting these.
No comments:
Post a Comment